High-capacity lifting is in ever-increasing demand. Julian Champkin looks at the market for hoists with capacities of 5t and above.

Classifications from the CMAA (Crane Manufacturers Association of America) are based not only on the maximum weight that a crane can lift but on its average load intensity and number of lift cycles. Simply put, crane service classifications are established by how much weight the system will need to lift, and also on how high the materials will need to be lifted, and the frequency that the crane will need to perform those tasks.

Two cranes with the same capacity, span, and size can differ in the average load intensity and loading cycles. Class D cranes are designed for heavy service applications. As a guide, 50 percent of the crane’s rated capacity will be handled constantly throughout the workday and the crane will need to perform many lifts per hour. Class D cranes are designed to move loads quickly and are usually installed in locations where heavy equipment must be moved constantly. This service is often used for applications in heavy machine shops, foundries, fabricating plants, steel warehouses, container yards, and lumber mills.

CMAA classifications continue through E—‘Severe’—and F—‘Continuous severe’— service. “So as a generalisation Class D is the ‘in between’ classification,” says Pimblett. “It is the kind of crane that customers—and sometimes even sales people—get wrong. Because it is not just about how much it lifts; it is also about how often it does it. Once a day, or once a month or once a year—these need different designs of cranes. Bearings will need to be more robust, components longer-lasting, and so on. Class D cranes could be subjected to large loads, but only infrequently would they be lifting to their maximum capacity.

“It means that costs and delivery times have been much reduced; so has the risk of getting it wrong. 80% of Street Crane sales go outside the UK, and we supply components to other manufacturers who use our software.”

“Building a high-capacity crane usually entails more than just scaling up a smaller one,” say EHM’s Comiono. The reason is that a high-capacity crane may be absolutely vital to the company’s operations. “Clients tend to want gingerbread added, safety and automation and control devices that make it a bit more complex. So it is very common to want load cells with digital displays that show its lifting history and what it is currently carrying. Remote control is just about standard on everything these days, big or small. And reliability is key. If a smaller crane fails you can bring in another or have work-arounds; but if a plant needs a heavy-lifting crane, that equipment is likely to be the only one there is at the site and very central to all its operations, so they will need it to be absolutely reliable. A power plant that has one 200t crane to remove its turbine will want to be absolutely certain that the crane will work when it is needed.

“Usage is a factor. The power plant gantry crane might be used once a month; a similar high-capacity crane in a shipyard gets much more use, and sometime abuse, as well. So it will need heavier bearings, different drum to rope ratios, and so on. We follow CMAA criteria. The application will drive the design.

“Faster speeds are becoming more demanded. It used to be that 4 or 5 feet a minute was good for a 100t crane. Now 10– 15 feet a minute (3–5m/min) is standard, and that of course calls for greater power. People want anti-collision devices, by laser or infra-red, and usage monitors to record the cycles and hours so that maintenance can be planned. The Internet of Things is coming in, and my guess is that it will apply to heavy lifting gear as to everything else.”

GW Becker is currently working on several new projects that will use heavy duty systems. All are Class D cranes, and are going to be used in a number of industries and different applications. Oil and gas, speciality metal facilities, glass manufacturing, forges, aerospace industries and transportation facilities are among them.

“One example from this year is for a glass manufacturing equipment company,” says Baker. “It included a top-running double girder overhead crane. This crane is a Class D crane with a span of 40ft, bridge speeds of 300 ft/min (90m/min) and trolley speeds of 180 ft/min (55m/min).

“Over the past few years, GWBI’s involvement in the oil and gas industry has consistently grown. We have noticed also an influx of steel mills which are revamping their safety standards and regulations. These revised standards apply to new projects, but are requiring the addition of new safety systems, such as collision avoidance and fall protection on existing equipment as well. That may be why in recent months we have noticed a higher demand for reliability, safety, remote telemetry and ease of diagnostics for fault diagnosis and feedback, and commonality of existing components.

Julian Champkin looks at the market for hoists with capacities of 5t and above



__________________
Page 1 of 1  sorted by
 
Quick Reply

Please log in to post quick replies.



Create your own FREE Forum
Report Abuse
Powered by ActiveBoard