concretesubmarine.com/ FORUM

Members Login
Username 
 
Password 
    Remember Me  
Post Info TOPIC: Eighth STS crane for Buenos Aires container terminal


Guru

Status: Offline
Posts: 2322
Date:
Eighth STS crane for Buenos Aires container terminal
Permalink   
 


Liebherr has commissioned its eighth ship-to-shore container crane to be sold to the Exolgan Container Terminal in Buenos Aires, Argentina, as part of the facility’s continuing expansion.

With an outreach of 51.5m, a back reach of 14m and a 31.4m span, the latest addition to Exolgan Container Terminal’s fleet will be able to service vessels with up to 20 rows of containers.

It has a safe working load of 62.5t, using a twin-lift spreader, and can lift up to 40m over the rail.

Exolgan Container Terminal currently handles a third of all containers into and out of Argentina and has already extended its berth by 360m to allow the servicing of two Post-Panamax vessels simultaneously.

Eighth STS crane for Buenos Aires container terminal



__________________
Page 1 of 1  sorted by
 
Quick Reply

Please log in to post quick replies.



Create your own FREE Forum
Report Abuse
Powered by ActiveBoard