Structural Engineering & Construction Engineering of the concrete barge
Project Details:
260 ft. long x 110 ft. wide x 24 ft. deep barge constructed at Robin Shipyard in Singapore, towed 10,000 miles across the Pacific Ocean to Baja, California and outfitted for use as a floating platform to support a phosphate processing plant.
Challenge:
Platform was required to be in continuous, uninterrupted service for 80 years without dry-docking for maintenance.
Solution:
Because steel barges need frequent dry-docking and have a typical lifespan of 25 years, a precast concrete solution was sought. Alfred Yee’s patented prestressed concrete Honeycomb System was chosen for its extremely high structural strength and rigidity utilizing the minimum amount of concrete, reinforcing steel and prestressed steel.
Results:
In 1980, the Rofomex I was launched as the first vessel utilizing the Honeycomb System.
The possibility to build large concete shell floating structures is proofen already - what is left to apply is bringing that kind of structures to a smaller scale.
Kikvape design, develop and manufacture various products and tools for the vaporization of essential oils. Our current product range includes rosin press, ... rosin press machine
Active board for the submarine is held for the struggle by all issues. The range of the Dermal fillers in Yeovil are implied for the terms. Skills reformed for the hoof the chunks. This machine is extremely good for the manufacturers of the field.
Nice post. I was checking constantly this blog and I’m impressed! Extremely useful info specially the last part I care for such information a lot. I was seeking this certain info for a long time. Thank you and good luck. Call of Duty