concretesubmarine.com/ FORUM

Members Login
Username 
 
Password 
    Remember Me  
Post Info TOPIC: 20 Ton Overhead Grab Crane for Scrap Handling Solution in Pakistan


Guru

Status: Offline
Posts: 2322
Date:
20 Ton Overhead Grab Crane for Scrap Handling Solution in Pakistan
Permalink   
 


 Our customer comes from FF Steel, which is the largest and fastest production re-rolling steel plant in Pakistan. It is also the only steel plant in Pakistan that can manufacture grade 60 and 70 steel bars. Its products are mainly used in high-rise buildings, large commercial buildings and other projects.

The Pakistan steel plant requirements for cranes

  • FF Steel’s requirement was to install the bridge scrap crane in the scrap plant for grabbing/extracting scrap iron. DQCRANE, drawing upon our experience and expertise, recommend QN type overhead crane with hook and grab for his application.
  • QN Model overhead crane is developed on the basis of general purpose overhead crane, it’s a two purpose type crane which the lifting device include hook and grab.
  • The bridge crane generally is made up of trolley traveling mechanism, crane traveling mechanism, electric system and bridge metallic structure. The hoisting mechanism contains motor, detent, reducer, winding drum, and pulley block. The main lifting devices include grab bucket and hook.

Why choose QN type overhead crane:

Why choose QN type overhead crane:

  • DQCRANE QN model bridge crane is called a multi-function bridge crane with grab hook.
  • On the basis of QD type overhead crane with hook, a cable reel installation position is reserved on the trolley for powering the grab (usually an electro-hydraulic grab) or electromagnet.
  • At the same time, the electrical cabinet also reserves a cable reel connection port. All electrical components are also larger than the general QD when matching, and the power of hydraulic grab and electromagnet should be considered.
  • The other parts are the same as QD, the bottom is the hook, you can hang electromagnet or hydraulic grab at any time.
  • If you still don’t understand, you can refer to the above figure and study it carefully

Components of the 20 Ton Overhead Grab Crane

Steel plant overhead crane production processSteel plant overhead crane production processSteel plant overhead crane production process

Steel plant overhead crane installation:

To ensure you pick the best solution for your job, be sure keep the following factors in mind:

  • Number of tons to be moved.
  • Distance to be moved.
  • Maximum lift height required.
  • Necessary below-the-hook devices (magnets, grab, grab bucket, etc.)
  • Amount of cycle time needed (working time).

No matter the crane application or weight required, Dongqi Group provide safe, efficient load management with solutions. Contact us today to discuss how our scrap removal cranes can help with your next project Email: sales010@cranesdq.com.

The Others 20 ton Overhead Crane case in Pakistan

How to customize Overhead Crane in Pakistan

We are a crane manufacturer located in China, providing crane customization services to global crane customers. If you want to customize a Overhead Crane, you can leave a message on the website or email, tell us the following information, and our sales manager will contact you:

  • Lifting capacity (ton): __ ?( The rated capacity)
  • Lifting height (m):__ ? (Height from hook center to the floor)
  • Span (m): __ ? (Distance between rail center)
  • Lifting speed (m/min): __ ? ( Single, Dual, Variable)
  • Traveling distance (m): __ ? (The length of the rail)
  • Work duty: __ ? (How many hours a day? How many times an hour?)
  • What material to be lifted: __ ?
  • Industrial voltage: __ ? ( like :380V, 50Hz, 3ph )


__________________
Page 1 of 1  sorted by
 
Quick Reply

Please log in to post quick replies.



Create your own FREE Forum
Report Abuse
Powered by ActiveBoard