100 Ton Double GirderEOT CranePrice$103,000and up, include different kinds price offers.
It contains only the equipment price, please provide the specific span, lifting height you need and fill in the bottom table, immediately you will free to get specific quotation. Supporting power line and rail of 100 Ton Double Girder EOT Crane Price, and the transportation and installation plan, you need to provide the double girder EOT crane use site, using environment and run length in the following table, we will provide you freely with detailed solution and quotation.
100 Ton Double Girder EOT Crane Price by different classification, it is also called double girder bridge crane, suitable for indoor or outdoor fixed cross handling and lifting work. Working level generally include A3, A5, A6. A3 double girder EOT crane apply to maintenance equipment in power plants and other places that not often use. A5 is double girder overhead crane usually use working level, commonly used in factories and mines, workshops, warehouses and other places. A6 double girder EOT crane usually used for frequently use place, it belongs to heavy duty system.
About 100 Ton Double Girder EOT Crane Price
In general, the quotation for a 100 ton overhead crane does not include the following:
Installation costs: including installation, debugging, testing, acceptance, and other expenses.
Transportation costs: including transportation costs, loading and unloading fees, etc. during the transportation process.
Taxes and fees: including value-added tax, customs duties, etc.
Other expenses: including maintenance, operation training, and other expenses.
We are a crane manufacturer located in China, providing crane customization services to global crane customers. If you want to customize a Overhead Crane, you can leave a message on the website or Email: sales010@cranesdq.com, tell us the following information, and our sales manager will contact you:
Lifting capacity (ton): __ ?( The rated capacity)
Lifting height (m):__ ? (Height from hook center to the floor)
Span (m): __ ? (Distance between rail center)
Lifting speed (m/min): __ ? ( Single, Dual, Variable)
Traveling distance (m): __ ? (The length of the rail)
Work duty: __ ? (How many hours a day? How many times an hour?)
What material to be lifted: __ ?
Industrial voltage: __ ? ( like :380V, 50Hz, 3ph )