10 ton Double Girder EOT with Grab Bucket parameters
Lifting capacity: 10T
Lifting height: 15M
Span: 23M
5m³Grab Bucket
Working class: ISO M7
Power supply: 415v, 3phase, 50hz
Cabin control
20 ton Double Girder EOT with Grab Bucket parameters
Lifting capacity: 20T
Lifting height: 16M
Span: 23M
5m³Grab Bucket
Working class: ISO M7
Power supply: 415v, 3phase, 50hz
Cabin control
Technical information
Lifting capacity
t
15
20
Lifting height
m
11.5
11.5
Span
m
15.75
15.75
Speed
Trolley traveling
m/min
39.7
39.7
Crane traveling
71
71
Lifting
7.9
7.2
Working class
/
ISO M5
ISO M5
Power supply
V/Hz
380v, 3phase, 50hz
380v, 3phase, 50hz
Trolley traveling power
KW
4
4
Crane traveling power
2*6.3
2*6.3
Hoisting power
26
26
Total power
42.6
42.6
Total Crane Weight
t
20.95
22.14
Max crane wheel load
KN
153
153
Protection class
/
H
H
Insulation class
/
IP54
IP54
Working temperature
/
-20℃ ~ +50℃
-20℃ ~ +50℃
Steel
/
Q235B
Q235B
Country of Origin
/
China
China
Note: Recommended Crane Rail Specification (not included in quotation)
Type
Top Width(mm)
Bottom Width(mm)
Height(mm)
Weight(kg/m)
P43
70
114
140
44.65
The double girder grab overhead crane fetching device is a grab bucket that can grab bulk materials. The double girder grab bridge crane has an opening and closing mechanism and a hoisting mechanism, and the grab is suspended on the opening and closing mechanism and the hoisting mechanism with four wire ropes respectively. The opening and closing mechanism drives the grab bucket to close and grab the material. When the bucket mouth is closed, the hoisting mechanism is started immediately, so that the four steel wire ropes are evenly loaded for hoisting work. When unloading, only the opening and closing mechanism is activated, and the bucket mouth is opened immediately to tilt the material. Except for the different lifting mechanism, the rest of the structure of the grab bridge crane is basically the same as that of thehookbridge crane.
Application of double girder grab bridge crane:
1. Double-girder grab bridge cranes are widely used in power plants, freight yards, workshops, docks, coal stations, etc. for the loading and unloading of bulk materials.
2. Double-girder grab cranes are strictly prohibited to be used in flammable and explosive environments. If there are special needs for use, non-standard design can be customized.
3. All mechanisms of the grab bridge crane are operated in the cab, and the directions for entering the platform door of the cab are: end entry, side entry and top entry.
4. The grapple crane is equipped with a grab bucket, and the style and model specification of the grab bucket can be selected according to the needs of use.
5. The opening direction of the grab is parallel and vertical. The grabbing device is a four-rope grab with double drums, which is simple in structure and reliable in operation. The grab can be opened and closed at any height. When the grabbing material particles are less than 100mm, the effect is good and the production efficiency is high. When the grabbed particles are 200mm large, a toothed grab is required.