concrete submarine problems, a lot of imaginary - not existing - problems are discussed on nonsense talker forums. Get the real thing - engineering group who has been there and done that. A good starting point to catch up is the discussion forum here.
Mentoring • advisory • marine engineering • project setup | http://nautilusmaker.com/t/what-you-should-know-about-me/1584/1 | funded tips and know how... | get a boardroom to talk the details for only USD 20 here | don´t listen to the nonsense talkers - get THE expert who has built the worlds most notorious concrete submarines. | nautilusmaker® |
Most of the problems that have been discussed asociated with concrete submarine hulls are imaginary problems.
Only very few people really understand that tubular concrete structures in hydrostatic load, in a load cycle ambient of some 1 million cycles per year, with a service life of 200 years are in use as we speak.
So the whole perception of "unknown problems to expect" - is just a basic lack of knowlege - which is very common in discussion forums.
This is one of the reasons why we have cut back broad discussion with a general public, in our concrete submarine efforts.
The truth is, anything in load cases to expect in a concrete submarine, is widley tested in long term performance over decades.
concrete submarine design - the design of a concrete submarine must follow different criteria than traditional naval steel design. - Tubular concrete structures from civil engineering are pointing out the correct direction.
Sometimes we’ll be able to fix the problem right then and there. If the trouble is more serious, we’ll need to get you a tow back to the garage, which is still no problem at all. emergency roadside truck repair